This home suffered from severe flooding all over the first floor of the house, flooding the master bedroom along with the entire living room!
-
A new lamp has been installed in the entrance of the house.
-
old plywood walls have been removed and replaced with sheet rock in the living room area.
-
Tub and window have been removed in the master bathroom.
-
A concrete slab has been removed from the living room, as well as refill to level.
-
Texture of master bedroom and bathroom have been changed.
-
Tile floor from the homes entrance has been removed and replaced.

after the living being stripped and dried our team got to work and began installing sheet rock all around the walls of the living room.